Student-project on building optimisation completed!

Verwandte Themen 

Kettelhack was part of a practical project that was developed by a mechanical engineering student at the end of 2020 in cooperation with pbr NETZenergie. The aim of this project was to work out different types of green roofs and to determine the synergy effects that result from the parallel use of green roofs and photovoltaic systems. Since roof renovations were planned anyway, we were happy to take the opportunity to serve as a practical example in this project. The result of this potential analysis will flow into the precise planning and design of future roof renovations.

Verwandte Artikel

Living Wage Project

Kettelhack participates in the Partnership Project on the topic of living wages. Within the framework of a Living Wage Lab, the participating …

Infographic
Development of water consumption in m3

The high level of water consumption in production brings with it a corresponding volume of waste water. Compliance with the limit values from the Waste Water Ordinance is ensured by the indirect discharge permit. The daily control of the mixing and equalisation basin by our employees, as well as through the regular inspections by the responsible monitoring authorities, give us the necessary security.